Commercial Fit-out Specialists
contact us
01874 615 120
info@bbi-uk.com
Newtown_Hosp_side_2.jpg


Newtown_Hosp_side_4.jpg


Newtown_Hosp_side_3.jpg


Newtown Hospital

Project

Newtown Hospital, Newtown

Project value

£300k | Time scale: 12 weeks

The client

Newtown Hospital has x-ray facilities, physiotherapy, occupational therapy, dietician and provides a wide range of outpatient clinics.

The design brief

To strip off and replace 370sqm of existing roof covering, fit new roof lights with triple glazing. Demolish the existing consultation rooms and re-build to a new layout more suited to new ways of working. New suspended ceilings with Thorlux LED lighting controlled by PIRs and new vinyl flooring by Altro.

Project delivery

A new Garland Stress-ply system roof was fitted with 10 year guarantee.

New LTHW Heating Installation, domestic hot & cold water services, mechanical supply and extract ventilation, automatic controls, sanitary appliances and wastes.

Each room fitted with low surface temperature radiators with all pipe work boxed in. All taps fitted were in strict accordance with NHS guidelines for water systems. Wall protection to all areas and new Wi-Fi system.

 

 

back to top