Harman House - Ground Floor
CS2
Uxbridge
£700K
12 Weeks
500sqm CAT A office refurbishment completed to SKA Gold rated standard. Bbi were also awarded Considerate Construction ‘Performance Beyond Compliance’ for the works completed.
Further Information & PDF Case StudyMagna Park, Lutterworth
CS2
Lutterworth, Leicestershire
£1.8M
12 Weeks
A fast paced refurbishment of the old Primark Stores warehouse building, office space and surrounding grounds.
Further Information & PDF Case StudyMarchmont House, Landlord Area Refurbishment Phase 2
DTZ and Cushman & Wakefield
Cardiff
£450K
12 Weeks
The project required the refurbishment of all toilets and landlord areas across 4 floors. There was a new colour scheme required alongside fixtures and fittings, made difficult as every floor had a different layout.
Further Information & PDF Case StudyMetro Building Warehouse Refurbishment
Edwin Thompson LLP
Swindon
£2.4m
14 months
After a 15 year period of minor updates from the previous occupier, this warehouse and distribution facility required an extensive refurbishment to bring it up to a re-lettable condition.
Further Information & PDF Case StudyZuken, First Floor Cat A Works
Beaven Consulting Ltd and Zuken
Aztec West, Bristol
£730K
8 Weeks
Working with Beavan Consulting Ltd, we completed the design and fit-out of the central plant and building services to 1st floor space at Zuken’s Aztec West office building.
Further Information & PDF Case Study95 Promenade, Cheltenham
CBRE and MAPP
Cheltenham
£270K
5 months
Situated in a prestigious central Cheltenham location, PJE / Bbi redesigned and refurbished all the toilet facilities in the building, created a shower room in the basement and updated the lobby areas across all five floors. As part of the works we upgraded the fresh air fans supplying the WC’s as well as installing a more efficient heating and hot water system feeding the communal areas.
Further Information & PDF Case StudyMarchmont House, Landlord Area Refurbishment
DTZ and Cushman & Wakefield
Cardiff
£400K
10 Weeks
The project required dilapidations of Marchmont House and a complete refurbishment of all office spaces and external works.
Further Information & PDF Case Study