Dilapidations / Cat A Fit-Out Case Studies

PROJECT

Harman House - Ground Floor

CLIENT

CS2

Location

Uxbridge

Value

£700K

Timescale

12 Weeks

500sqm CAT A office refurbishment completed to SKA Gold rated standard. Bbi were also awarded Considerate Construction ‘Performance Beyond Compliance’ for the works completed.

Further Information & PDF Case Study

PROJECT

Magna Park, Lutterworth

CLIENT

CS2

Location

Lutterworth, Leicestershire

Value

£1.8M

Timescale

12 Weeks

A fast paced refurbishment of the old Primark Stores warehouse building, office space and surrounding grounds.

Further Information & PDF Case Study

PROJECT

Marchmont House, Landlord Area Refurbishment Phase 2

CLIENT

DTZ and Cushman & Wakefield

Location

Cardiff

Value

£450K

Timescale

12 Weeks

The project required the refurbishment of all toilets and landlord areas across 4 floors. There was a new colour scheme required alongside fixtures and fittings, made difficult as every floor had a different layout.

Further Information & PDF Case Study

PROJECT

Metro Building Warehouse Refurbishment

CLIENT

Edwin Thompson LLP

Location

Swindon

Value

£2.4m

Timescale

14 months

After a 15 year period of minor updates from the previous occupier, this warehouse and distribution facility required an extensive refurbishment to bring it up to a re-lettable condition.

Further Information & PDF Case Study

PROJECT

Zuken, First Floor Cat A Works

CLIENT

Beaven Consulting Ltd and Zuken

Location

Aztec West, Bristol

Value

£730K

Timescale

8 Weeks

Working with Beavan Consulting Ltd, we completed the design and fit-out of the central plant and building services to 1st floor space at Zuken’s Aztec West office building.

Further Information & PDF Case Study

PROJECT

95 Promenade, Cheltenham

CLIENT

CBRE and MAPP

Location

Cheltenham

Value

£270K

Timescale

5 months

Situated in a prestigious central Cheltenham location, PJE / Bbi redesigned and refurbished all the toilet facilities in the building, created a shower room in the basement and updated the lobby areas across all five floors. As part of the works we upgraded the fresh air fans supplying the WC’s as well as installing a more efficient heating and hot water system feeding the communal areas.

Further Information & PDF Case Study

PROJECT

Marchmont House, Landlord Area Refurbishment

CLIENT

DTZ and Cushman & Wakefield

Location

Cardiff

Value

£400K

Timescale

10 Weeks

The project required dilapidations of Marchmont House and a complete refurbishment of all office spaces and external works.

Further Information & PDF Case Study