Office Case Studies

color-strip

Project

Linea

Client

Welsh Water

Location

St Mellons, Cardiff

Value

£820K

Timescale

10 weeks

At Welsh Water's Linear site, Bbi created a working environment that went beyond flexibility
and embraced a holistic approach to hybrid work.

Project

Cheltenham office relocation

Client

Endsleigh Insurance

Location

Cheltenham

Value

£300K

Timescale

8 weeks

CAT B fit-out works into central Cheltenham office building to accommodate 60 desks and various meeting / collaboration spaces

Project

The Chocolate Factory

Client

Mitie

Location

Keynsham, Bristol

Value

£800k

Timescale

14 Weeks

For Mitie’s Head Office Support team – create a modern working environment to combine two separate office sites in Bristol, onto a single floor of the old Cadbury’s Chocolate Factory on the outskirts of Bristol.

Project

63 St Mary Axe

Client

AXA IM and Constructive

Location

London

Value

£550K

Timescale

8 weeks

CAT A+ works to 3rd floor of AXA Investment Managers owned building in central London. New LED lighting throughout, with a CAT B style fitout created – ready for immediate occupation by potential new tenants.

Project

Office Fitout @ One Kinsgway

Client

sa.global

Location

Cardiff

Value

£200K

Timescale

4 weeks

A rapid turnaround project to 6th floor, One Kingsway, Cardiff. Full design and fitout of office space to leading global Microsoft Dynamics service provider.

Project

Sunley House Office Refurbishment

Client

Zurich

Location

Croydon

Value

£

Timescale

23 Weeks

Zurich have occupied two floors of the 11 storey building for a number of years and the site was looking rather tired. With the introduction of flexible working, hot desking and collaborative style environments, we were able to design all of the needs required for Croydon staff to fit on a single 900sqm floor.

Project

27 Kings Road Refurbishment

Client

Equiniti

Location

Reading

Value

£1.8M

Timescale

28 weeks

Equiniti have occupied this site for more than 10 years and it was in desperate need of a refurbishment throughout its 4 floors – including complete new M&E to the landlord areas alongside the standard office fit-out. Works were carried out on a floor by floor basis – whilst maintaining 100% occupancy and no impact on operational delivery.

Project

Company HQ Fit-Out

Client

Care for the Family

Location

Newport, South Wales

Value

£1.6M

Timescale

32 Weeks

Bbi were awarded the contract for the full refurbishment of this national charity’s HQ facility. Forming offices, distribution centre alongsidea broadcasting and recording facility that required careful acoustic design consideration.

Project

Park Street Reception Refurbishment

Client

Lambert Smith Hampton

Location

Cardiff

Value

£70k

Timescale

7 Weeks

Bbi were tasked with refurbishing the dated reception area within 6 Park Street in Cardiff, creating a modern show piece as the main focal point upon entry to the building.

Project

One Central Square, Cardiff - Office Refurbishment

Client

Julian Hodge Bank

Location

Cardiff

Value

£900,000

Timescale

9 Weeks

Beacons Business Interiors were commissioned to design and fit out Julian Hodge Bank’s new headquarters at One Central Square, Cardiff. Within the design, the client wanted to reflect the companies core values. The Design also featured a bespoke reception desk designed by the Bbi team.

Project

Archway House, Cardiff

Client

Wales and West Housing Association

Location

Cardiff

Value

£3.4M

Timescale

8 Months

BBI were engaged by the client with a specific brief to turn an existing 1990’s building into a modern user-friendly office space fit for nearly 200 members of staff. As well as the need to house a considerable amount of staff W&WHA also wanted the building to be environmentally friendly in terms of its energy consumption.

Project

Office Fit-out

Client

Zurich

Location

Colmore Circus, Birmingham

Value

£**

Timescale

18 Weeks

Design and fit-out of 2172 sqm CAT A space in prominent Birmingham business district. Creating an invigorating environment, in keeping with Zurich brand image & Dynamic Working principles already achieved in Glasgow and Leeds.