M&E / Manufacturing Case Studies

PROJECT

Temperature Controlled Warehouse

CLIENT

Biotec Services International Limited

Location

Cardiff

Value

£700k

Timescale

16 Weeks

To convert a disused warehouse into a modern temperature controlled pharmaceutical packaging and storage facility.

Further Information & PDF Case Study

PROJECT

Warehouse & Office Fit-Out

CLIENT

Sharp UK

Location

Rhymney

Value

£5m

Timescale

9 Months

The facility had to be capable of performing the following functions, within predetermined specifications, in a controlled, safe, reproducible and qualified way: Primary Packing and associated support areas. Secondary Packing and support areas to provide a flexible environment able to host specific packing requirements in accordance with business demands. Office accommodation to support the efficient operation of the facility.

Further Information & PDF Case Study3D Photography Link

PROJECT

Cell 4

CLIENT

GKN Aerospace design

Location

Filton, Bristol

Value

£440k

Timescale

10 Weeks

Design and build an enclosed standalone structure, (cell) to house 3D printing machines – required to operate in a temperature and pressure controlled environment.

Further Information & PDF Case Study

PROJECT

Laboratory and office space

CLIENT

Zurich

Location

Steel Park, Wolverhampton

Value

£**

Timescale

16 Weeks

D&B new workshop, laboratory, office and training facility into 1070sqm new-build warehouse. Work closely with the engineering team to provide specific spaces for differing machinery and testing units with specific needs tailored to suit.

Further Information & PDF Case Study