M&E / Manufacturing Case Studies

color-strip

Project

Space 100

Client

Kohler Mira

Location

Cheltenham

Value

£430k

Timescale

6 weeks

Convert old warehouse space into a visitor centre that displays the history of the Kohler Mira brand as well as an interactive space for customer and internal presentations

Project

Temperature Controlled Warehouse

Client

Biotec Services International Limited

Location

Cardiff

Value

£700k

Timescale

16 Weeks

To convert a disused warehouse into a modern temperature controlled pharmaceutical packaging and storage facility.

Project

Warehouse & Office Fit-Out

Client

Sharp UK

Location

Rhymney

Value

£5m

Timescale

9 Months

Project

Cell 4

Client

GKN Aerospace design

Location

Filton, Bristol

Value

£440k

Timescale

10 Weeks

Design and build an enclosed standalone structure, (cell) to house 3D printing machines – required to operate in a temperature and pressure controlled environment.

Project

Laboratory and office space

Client

Zurich

Location

Steel Park, Wolverhampton

Value

£**

Timescale

16 Weeks

D&B new workshop, laboratory, office and training facility into 1070sqm new-build warehouse. Work closely with the engineering team to provide specific spaces for differing machinery and testing units with specific needs tailored to suit.