
Temperature Controlled Warehouse
Biotec Services International Limited
Cardiff
£700k
16 Weeks
To convert a disused warehouse into a modern temperature controlled pharmaceutical packaging and storage facility.
Further Information & PDF Case StudyWarehouse & Office Fit-Out
Sharp UK
Rhymney
£5m
9 Months
The facility had to be capable of performing the following functions, within predetermined specifications, in a controlled, safe, reproducible and qualified way: Primary Packing and associated support areas. Secondary Packing and support areas to provide a flexible environment able to host specific packing requirements in accordance with business demands. Office accommodation to support the efficient operation of the facility.
Further Information & PDF Case Study3D Photography LinkCell 4
GKN Aerospace design
Filton, Bristol
£440k
10 Weeks
Design and build an enclosed standalone structure, (cell) to house 3D printing machines – required to operate in a temperature and pressure controlled environment.
Further Information & PDF Case StudyLaboratory and office space
Zurich
Steel Park, Wolverhampton
£**
16 Weeks
D&B new workshop, laboratory, office and training facility into 1070sqm new-build warehouse. Work closely with the engineering team to provide specific spaces for differing machinery and testing units with specific needs tailored to suit.
Further Information & PDF Case Study