M&E / Manufacturing Case Studies

color-strip

Project

Temperature Controlled Warehouse

Client

Biotec Services International Limited

Location

Cardiff

Value

£700k

Timescale

16 Weeks

To convert a disused warehouse into a modern temperature controlled pharmaceutical packaging and storage facility.

Project

Warehouse & Office Fit-Out

Client

Sharp UK

Location

Rhymney

Value

£5m

Timescale

9 Months

Project

Cell 4

Client

GKN Aerospace design

Location

Filton, Bristol

Value

£440k

Timescale

10 Weeks

Design and build an enclosed standalone structure, (cell) to house 3D printing machines – required to operate in a temperature and pressure controlled environment.

Project

Laboratory and office space

Client

Zurich

Location

Steel Park, Wolverhampton

Value

£**

Timescale

16 Weeks

D&B new workshop, laboratory, office and training facility into 1070sqm new-build warehouse. Work closely with the engineering team to provide specific spaces for differing machinery and testing units with specific needs tailored to suit.